Proven Project Delivery
ZR has successfully delivered hundreds of projects. Check out our work to see what project success could look like for you.
OPC Power Plant
Installation of all static and rotated equipment, Turbine enclosures (Center line and BOP), all piping segments, steel and structure ducts and exhaust.
Duration of the project 12 months
Leviathan Project
As part of the Leviathan Development Project, a condensate receiving terminal was established with a Truck Loading system and Storage Tank. Scope included process and firefighting piping, skid/equipment and pipe rack installation, structural works, and fabrication/installation of a firefighting storage tank, along with related procurement and certification services.
Alon Tavor Power Plant
As part of our comprehensive scope of work at the Alon Tavor Power Plant, our team successfully executed the installation of high-capacity bus ducts, ensuring reliable and efficient electrical power transmission between key systems
Trusted by Leading Clients















Certified to the hightest industry standards

BSI 501

SI 5664-3

API 650

AWS D1.1

AWS D1.6