Alon Tavor

Alon Tavor

Alon Tavor Power Plant – Strategic Energy Infrastructure Project

Project 1: Alon Tavor Power Plant – Mechanical & Piping (BOP Systems)

Sami Zaatut Ltd. acted as a key contractor for the Alon Tavor Power Plant, focusing on the full execution of mechanical and piping works. This included the installation of four FT4000 aero-derivative gas turbines, a demineralized water tank, and a large-scale liquid fuel oil tank. Our scope also encompassed all Balance of Plant (BOP) systems such as fuel and water pipelines, auxiliary systems, and structural supports. The project was delivered under stringent safety, quality, and performance standards, showcasing our capability to handle complex power generation infrastructure.

Project 2: Alon Tavor Power Plant – Bus Duct Installation & Electrical Integration

In the same strategic energy project, Sami Zaatut Ltd. managed the complete installation of the bus duct system, ensuring seamless integration between the turbines and the electrical infrastructure. This work was executed with precision to meet the highest operational and reliability standards, enabling efficient power transmission within the plant. Our team’s expertise in electrical integration was critical to the project’s success, ensuring compliance with international safety and quality requirements.