ICL - Dead Sea

ICL - Dead Sea

Industrial Fabrication & Installation

Heavy-Duty Storage, Pipeline, and Material Handling System Execution

As part of our work at the Dead Sea Works industrial complex, we carried out several key projects involving heavy industrial fabrication and installation. These included the fabrication and installation of a 17-meter diameter soda tank, along with the design and assembly of a dedicated pipe bridge structure supporting pipelines connected to a 25-ton tank. In addition, we completed the full engineering, fabrication, and installation of a material handling system, which included a 24-inch wide conveyor belt extending 70 meters in length. All works were performed according to the highest industry standards, with strict adherence to safety, quality, and schedule.