IEC - Orot Rabin
IEC - Orot Rabin
Fire Fighting & Storage Tanks Modification
Project: IEC Orot Rabin Power Station – Safety Systems Upgrade
Executed a full EPC (Engineering, Procurement, and Construction) scope for the fire-fighting system of the entire storage tank facility at the Orot Rabin Power Station. The project included comprehensive engineering, procurement, installation, and commissioning of upgraded fire-protection infrastructure, as well as modifications and adaptations to the storage tanks in line with updated operational and safety requirements. The works significantly enhanced fire-protection capabilities and ensured full compliance with stringent safety, regulatory, and power-plant operational standards, supporting safe and continuous plant operations.
